What the Master Plan Will Show
The master plan of Kamathipura Redevelopment Mumbai will show how 34 acres, 15 lanes and 734 buildings come together as one redeveloped neighbourhood. An official layout drawing has not been released yet. This page explains the planning approach, the parts that are already known and the details to watch for.
The approach itself is clear. Because the project is a cluster redevelopment under Regulation 33(9) of DCPR-2034, planners can look at the entire area at once. That matters more than any single building design.
What the Master Plan Covers
Housing zones
Areas for rehabilitation homes, new MHADA housing and apartments of 2, 3 and 4 BHK.
Commercial areas
Spaces for offices and retail shops, including those for existing commercial occupants.
Roads and lanes
A reworked street network with wider, better-maintained roads and improved internal links.
Utilities
Water, drainage and civic systems planned for the full area.
Open and community space
Planned open areas, landscaping, play areas and shared community spaces.
Heritage sensitivity
Planning that aims to preserve the historic character of Kamathipura.
Want the master plan when it is published?
Leave your details and we will share the layout and any approvals as soon as they are available.
How Cluster Planning Changes the Layout
In a normal redevelopment, each society rebuilds on its own plot. The plot shape, the width of the lane outside and the building next door decide what is possible. In a cluster plan, plot boundaries matter much less.
Planners can shift buildings to make room for a wider road, join small leftover pieces of land into one open space, and place taller buildings where they will not block light for others. Utility lines can be laid in a straight line through the area. The result is usually a more open and better-connected neighbourhood.
The same logic also makes phasing possible. Early buildings can be completed first so that tenants from later phases can move into finished homes while their old buildings are rebuilt.

Likely Phasing of the Project
Phasing has not been published, but projects of this kind usually follow a pattern like the one below. Treat this as a general guide and not an official schedule.
- Surveys, approvals and signing of the development agreement. The agreement has already been signed.
- Construction start, expected around Diwali 2026.
- Completion of first rehabilitation buildings and shifting of the first group of tenants.
- Rebuilding of the remaining buildings in stages.
- Completion of roads, open spaces and civic works across the cluster.
What to Look for When the Master Plan Is Released
- The width and alignment of the new internal roads.
- The size and position of open spaces compared with the built-up area.
- How rehabilitation buildings and sale buildings are placed relative to each other.
- Entry and exit points to the main roads of South Mumbai.
- Phasing drawings that show which lane is rebuilt in which order.
The facilities that sit inside the plan are covered on our Kamathipura Redevelopment amenities page, and the surrounding neighbourhood is explained in the Kamathipura Redevelopment location guide.
Role of Open Space in the Plan
Open space is one of the biggest gaps in the current area. Because buildings stand shoulder to shoulder, there is very little land left for trees, play areas or community use.
A cluster plan allows land to be pooled. Small leftover pockets can become larger, more usable spaces. The plan lists open areas, landscaping, children's areas and recreation zones as part of the upgrade. The final size and location will only be clear when the master plan is out.
Movement, Traffic and Safety
Good movement planning is what separates a modern cluster from an old crowded area. Wider roads let fire engines and ambulances reach every building. Clear separation between pedestrian and vehicle routes cuts accident risk, and planned parking reduces roadside clutter.
The project aims to improve internal connectivity and access to essential services. For a dense area like this, these changes may be the most noticeable part of the redevelopment.
Respecting Kamathipura's Heritage
Kamathipura has a long history as part of old South Mumbai. The project states that it wants to modernise the area while preserving its historic character.
In planning terms, this can mean careful building heights, street frontages that fit the surroundings and the retention of important community places. How far this goes will depend on the approved design.
Who Prepares and Approves the Master Plan
A cluster master plan is not drawn by one party alone. The appointed agency and its architects prepare the layout, MBRRB and MHADA review it, and it must meet the rules of DCPR-2034 before it is approved.
This review matters because a cluster plan receives certain benefits under Regulation 33(9). In return, the plan has to deliver rehabilitation homes, civic upgrades and housing stock for MHADA. The approved drawing is therefore a record of what each party has agreed to deliver.
Master Plan and Your Own Building
Most residents will want to know one thing: where will my home be? The answer will come from the approved layout and the allotment process, not from the general master plan alone.
When drawings are out, locate your current lane, find the phase it falls in and ask when your building is due to be rebuilt. Also ask where temporary housing is available until then.
- Which phase includes my building?
- How long will temporary housing be needed?
- Where will my new home sit in the layout?
- How will the new lane and entry look near my present address?
Master Plan Terms in Simple Words
| Term | What It Means |
|---|---|
| Layout plan | A drawing showing roads, plots, buildings and open spaces together. |
| Phasing | The order in which parts of the project are built and handed over. |
| Rehab component | Buildings reserved for existing eligible tenants. |
| Sale or MHADA component | Buildings that add new housing stock beyond the rehab homes. |
| FSI | Floor space index, the rule that limits how much floor area can be built on land. |
Questions about how the plan affects your lane?
Ask us and we will help you read the official notices once they are out.